
Units 3-8
From £980 pcm
Build completed in 2020, energy performance rating A
Easily accessible within a terrace of 6
Opportunity for units to be joined to create larger working spaces
Steel portal frame construction
120mm insulated steel clad roof and elevations
Unallocated parking included
Air source heat and cooling pump for a climatic working environment
Site parking in excess of council requirements
Fitted disabled WC
Fitted kitchenette
Fitted mezzanine with chipboard floor
Floor coverings available at cost to ingoing tenant
Electric installation including lighting and power ring main
Three phase standard connection
Insulated, electric up and over door (roller shutter) providing vehicular loading
Separate pedestrian door to commercial specification